548.9-08: Specification for Type ES (Epoxy Slurry) Polymer Overlays for Bridge and Parking Garage Decks

Published By Publication Date Number of Pages
ACI 2008 9
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Specification covers epoxy slurry (ES) overlay for bridge and parking garage decks. Type ES polymer overlay incorporates low-modulus epoxybased slurry and selected aggregate to produce a flexible, skid-resistant, and water-resistant overlay. The overlay may be used for both new construction and rehabilitation. The overlay is placed by applying the polymer slurry to the surface and broadcasting aggregate. This Specification includes requirements for chemical components, aggregates, storage and handling, surface preparation, surface profile, mixing, placement, finishing, and quality control. Keywords: aggregate; bridge decks; epoxy; overlays; mortar; parking garage decks; polymer; premixed; resin; slurry.

PDF Catalog

PDF Pages PDF Title
3 CONTENTS
CONTENTS
4 SECTION 1— GENERAL
SECTION 1— GENERAL
1.1— Scope
1.1— Scope
1.1.1
1.1.1
1.1.2
1.1.2
1.1.3 Units
1.1.3 Units
1.2—Reference standards
1.2—Reference standards
1.2.1 ASTM International standards
1.2.1 ASTM International standards
1.2.2 SSPC standards
1.2.2 SSPC standards
1.3—Reference organizations
1.3—Reference organizations
1.4—Submittals
1.4—Submittals
1.4.1
1.4.1
1.4.2
1.4.2
1.5—Project conditions
1.5—Project conditions
1.5.1 Cold weather limits
1.5.1 Cold weather limits
1.5.2 Hot weather limits
1.5.2 Hot weather limits
1.5.3 Moisture limits
1.5.3 Moisture limits
1.6—Labeling, storage, and handling of materials
1.6—Labeling, storage, and handling of materials
1.6.1 Labeling
1.6.1 Labeling
1.6.2 Storage
1.6.2 Storage
1.7—Safety
1.7—Safety
SECTION 2— PRODUCTS
SECTION 2— PRODUCTS
2.1— Epoxy binder
2.1— Epoxy binder
5 2.2—Aggregate
2.2—Aggregate
2.3—Polymer overlay slurry
2.3—Polymer overlay slurry
SECTION 3— EXECUTION
SECTION 3— EXECUTION
3.1— Procedure qualification
3.1— Procedure qualification
3.1.1 Equipment
3.1.1 Equipment
3.1.2 Quality-control procedure qualification
3.1.2 Quality-control procedure qualification
3.1.2.1
3.1.2.1
3.1.2.2
3.1.2.2
3.1.2.3
3.1.2.3
3.1.2.4
3.1.2.4
3.1.2.5
3.1.2.5
3.1.2.6
3.1.2.6
3.1.3 Quality control of surface preparation
3.1.3 Quality control of surface preparation
3.2—Surface preparation
3.2—Surface preparation
3.2.1 Concrete decks
3.2.1 Concrete decks
3.2.2 Steel decks
3.2.2 Steel decks
6 3.2.3
3.2.3
3.2.4
3.2.4
3.2.5
3.2.5
3.3—Mixing epoxy binder
3.3—Mixing epoxy binder
3.3.1
3.3.1
3.3.2
3.3.2
3.3.3
3.3.3
3.4—Overlay application
3.4—Overlay application
3.4.1
3.4.1
3.4.2
3.4.2
3.4.3
3.4.3
3.4.4
3.4.4
3.4.4
3.4.4
3.4.5 Epoxy slurry placement
3.4.5 Epoxy slurry placement
3.4.6 Aggregate broadcasting
3.4.6 Aggregate broadcasting
3.5—Curing
3.5—Curing
3.5.1
3.5.1
3.6—Excess aggregate removal
3.6—Excess aggregate removal
3.7—Joints
3.7—Joints
3.8—Open to traffic
3.8—Open to traffic
NOTES TO SPECIFIER
NOTES TO SPECIFIER
General notes
General notes
G1.
G1.
G2.
G2.
G3.
G3.
G4.
G4.
G5.
G5.
FOREWORD TO CHECKLISTS
FOREWORD TO CHECKLISTS
F1.
F1.
F2.
F2.
7 F3.
F3.
F4.
F4.
F5.
F5.
F6. Recommended references
F6. Recommended references
MANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST
SUBMITTALS CHECKLIST