Shopping Cart

No products in the cart.

BS EN 50388-1:2022 – TC:2023 Edition

$258.95

Tracked Changes. Railway Applications. Fixed installations and rolling stock. Technical criteria for the coordination between electric traction power supply systems and rolling stock to achieve interoperability – General

Published By Publication Date Number of Pages
BSI 2023 180
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document establishes requirements for the electrical aspects to achieve technical compatibility between rolling stock and electric traction systems, limited to: – co-ordination of protection principles between power supply and traction units, i.e. separation sections, train set current or power limitation, short circuit current discrimination, breaker coordination and use of regenerative braking. – co-ordination of installed power on the line and the power demand of trains, i.e. traction unit power factor, train set current or power limitation, electric system performance, type and characterization. – compatibility assessment relating to harmonics and dynamic effects. Informative values are given for some parts of the existing European railway networks, in annexes. NOTE For those railways within the scope of EU Interoperability Directive, definitive values are set out in the register of infrastructure published in accordance with Article 49 of Directive (EU) 2016/797, and the list of items included in the register is described in the commission decision (EU) 2019/777. The following electric traction systems are within the scope of this document: – railways; – guided mass transport systems that are integrated with railways; – material transport systems that are integrated with railways. Information is given on electrification parameters to enable train operating companies to confirm, after consultation with the rolling stock manufacturers, that risks of non-compatibility are minimized and that there will be no consequential disturbance on the electrification system. The interaction between pantograph and overhead contact line is dealt with in EN 50367:2020. The interaction with the control-command and signalling subsystem is not dealt with in this document. Basic considerations have been included concerning the use of accumulator trains.

PDF Catalog

PDF Pages PDF Title
1 30462329
111 A-30430789
112 undefined
115 EN50388-1{2022}etp
120 1 Scope
2 Normative references
121 3 Terms, definitions and abbreviations
3.1 Terms and definitions
124 3.2 Term clarification, coherence and translation
125 3.3 Abbreviations and symbols
4 Periods over which parameters should be averaged or integrated – reference time
126 5 Separation sections
5.1 General
5.2 System separation sections
127 5.3 Phase separation sections
6 Power factor of a traction unit
6.1 General requirements
128 6.2 Particular conditions
6.2.1 Traction
6.2.2 Regenerative braking
6.2.3 Standstill
6.2.4 De-icing
6.3 Acceptance criteria
7 Train set current and power limitation function
7.1 General
7.2 Current limitation in accordance with infrastructure information
129 7.3 Automatic current or power limitation as a function of line voltage
7.4 Automatic power limitation as a function of frequency variation
131 7.5 Acceptance criteria
8 Electric traction power supply system performance
8.1 Dimensioning study
8.1.1 General
8.1.2 Traffic conditions
8.1.3 Parameters relating to the rolling stock and train sets
132 8.1.4 Parameters relating to infrastructure
8.2 Workflow
133 8.3 Voltage limits
134 8.4 Acceptance criteria
9 Type and characterization of electric traction power supply system
9.1 Type of electric traction power supply system
9.2 Characterization of electric traction power supply system
10 Harmonic and dynamic effects
10.1 General
135 10.2 Common codes of practice
10.3 Compatibility study
136 10.4 Acceptance criteria
11 Coordination of protection
11.1 General
11.2 Short-circuit current levels and its clearance
138 11.3 Closing or auto-reclosing of circuit breakers
140 11.4 Maximum inrush current of AC traction unit
11.5 DC electrification systems, transient current during closure
11.6 Acceptance criteria
141 12 Regenerative braking
12.1 General considerations on regenerative braking to the contact line
12.2 General conditions and requirements on the use of regenerative braking
12.2.1 Traction unit
142 12.2.2 Power supply system conditions
12.3 Acceptance criteria
13 Effects of DC operation on AC systems
143 14 Tests
15 Test methodology
15.1 Separation sections
15.1.1 Tests for traction unit
15.1.2 Tests for infrastructure
15.2 Power factor
15.2.1 Tests for traction unit
15.3 Train set current and power limitation
15.3.1 Current or power limitation function of the train set as a function of register of infrastructure information and function of line voltage – Tests for traction unit
144 15.3.2 Power limitation as a function of line frequency – Tests for traction unit
15.4 Requirements for performance of power supply – Tests for infrastructure
15.5 Coordination of protection
15.5.1 Short circuit current levels and its clearance
15.5.1.1 Tests for traction unit
15.5.1.2 Tests for infrastructure – in any new substation
145 15.5.2 Closing or auto-reclosing of circuit breakers
15.5.2.1 Tests for infrastructure – in any new substation
15.5.2.2 Tests for traction unit
15.5.3 Maximum inrush current of AC traction unit – Tests for traction unit
15.5.4 DC traction units; transient current during closure – Tests for traction unit
15.6 Regenerative braking
15.6.1 Tests for traction unit
146 15.6.2 Tests for Substation
147 Annex A (informative)Integration periods over which parameters can be averaged
A.1 General
A.2 Reference time period over which values can be averaged or integrated
148 Annex B (informative)Description, calculation and use of mean useful voltage
B.1 General
B.2 Description and methodology
149 B.3 Selection criteria determining the voltage U pantograph at the pantograph
150 B.4 Values for Minimum Mean Useful Voltage at the pantograph
151 B.5 Relation between U mean useful and U min1
B.6 Acceptance criteria
B.7 Testing
153 Annex C (informative)Sign convention of active and reactive power
C.1 Sign convention
156 C.2 description of power factor requirements
157 Annex D (informative)Maximum allowable train set current
159 Annex E (informative)Power limitation as a function of line frequency – 15 kV 16,7 Hz systems
160 Annex F (normative)Maximum traction current and power of a train set against voltage
162 Annex G (informative)Use of regenerative braking
163 Annex H (informative)Data related to the compatibility study of harmonics and dynamic effects
H.1 Characterization of the electric traction system installations
166 H.2 Characterization of the trains
169 Annex I (normative)Compatibility study
174 Annex J (normative)Special national conditions
175 Annex ZZ(informative)Relationship between this European Standard and the Essential Requirements of EU Directive 2016/797 aimed to be covered
BS EN 50388-1:2022 - TC
$258.95