Shopping Cart

No products in the cart.

BS EN 61326-2-4:2013

$102.76

Electrical equipment for measurement, control and laboratory use. EMC requirements – Particular requirements. Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9

Published By Publication Date Number of Pages
BSI 2013 20
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 61236-2-4:2012 specifies detailed test configurations, operational conditions and performance criteria for equipment for insulation monitoring according to IEC 61557-8 and insulation fault location according to IEC 61557-9. This applies to insulation monitoring devices and insulation fault location systems permanently or semi-permanently connected to the distribution system. This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. It includes the following significant technical change: update of the document with respect to IEC 61326-1:2012. This publication is to be read in conjunction with /2.

PDF Catalog

PDF Pages PDF Title
6 Annex ZZ (informative) Coverage of Essential Requirements of EU Directives
7 English
CONTENTS
8 1 Scope
2 Normative references
3 Terms and definitions
9 4 General
5 EMC test plan
5.1 General
10 5.2 Configuration of EUT during testing
5.2.1 General
5.2.2 Composition of EUT
5.2.3 Assembly of EUT
5.2.4 I/O ports
5.2.5 Auxiliary equipment
5.2.6 Cabling and earthing (grounding)
5.3 Operation conditions of EUT during testing
5.3.101 Operational conditions
11 5.4 Specification of functional performance
5.5 Test description
6 Immunity requirements
6.1 Conditions during the tests
6.1.101 Electrostatic discharge immunity tests
12 6.1.102 Electromagnetic field tests
6.1.103 Burst tests
6.1.104 Surge immunity tests
6.1.105 Conducted RF tests
6.1.106 Power frequency magnetic field tests
6.2 Immunity test requirements
13 6.3 Random aspects
6.4 Performance criteria
Table 101 – Immunity tests
14 Table 102 – Performance criteria definition
15 7 Emission requirements
7.1 Conditions during measurements.
7.2 Emission limits
8 Test results and test report
Table 103 – Test conditions for quiescent and operate modes
16 9 Instructions for use
17 Annex A (normative) Immunity test requirements for portable test and measurementequipment powered by battery or from the circuit being measured
18 Bibliography
BS EN 61326-2-4:2013
$102.76