BSI 22/30444943 DC 2022
$13.70
BS EN 63171. Connectors for electrical and electronic equipment. Shielded or unshielded free and fixed connectors for balanced single-pair data transmission with current-carrying capacity. General requirements and tests
Published By | Publication Date | Number of Pages |
BSI | 2022 | 35 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30444943-NC.pdf |
3 | 48B_2972e_CD.pdf |
6 | FOREWORD |
8 | INTRODUCTION |
10 | 1 Scope 2 Normative references |
12 | 3 Terms and definitions 4 Common features and typical connector pair 5 Characteristics 5.1 General 5.2 Pin assignment |
13 | 5.3 Classification into climatic category 5.4 Electrical characteristics 5.4.1 Creepage and clearance distances |
14 | 5.4.2 Voltage proof 5.4.3 Current-temperature derating |
15 | 5.4.4 Interface contact resistance – initial only 5.4.5 Input to output DC resistance |
16 | 5.4.6 Input to output DC resistance unbalance 5.4.7 Insulation resistance 5.5 Transmission characteristics (data transmission portion for a combined connector) 5.5.1 General |
17 | 5.5.2 Insertion loss 5.5.3 Return loss 5.5.4 Propagation delay 5.5.5 Transverse conversion loss |
18 | 5.5.6 Transverse conversion transfer loss 5.5.7 Transfer impedance (shielded only) 5.5.8 Coupling attenuation (screened only) |
19 | 5.5.9 Power sum alien (exogenous) NEXT |
20 | 5.5.10 Power sum alien (exogenous) FEXT 5.6 Mechanical characteristics (data transmission portion for a combined connector) 5.6.1 Mechanical operation |
21 | 5.6.2 Effectiveness of connector coupling devices 5.6.3 Insertion and withdrawal forces |
22 | 5.6.4 Polarizing method 5.6.5 Vibration 6 Tests and test schedule 6.1 General |
23 | 6.2 Example of an arrangement for input to output DC resistance measurement |
24 | 6.3 Example of arrangement for interface contact resistance measurement 6.4 Arrangement for vibration test (test phase CP) |
25 | 6.5 Test procedures and measuring methods 6.6 Preconditioning 6.7 Test schedules 6.7.1 General 6.7.2 Basic (minimum) test schedule 6.7.3 Full test schedule 6.7.3.1 General 6.7.3.2 Test group P – Preliminary |
26 | 6.7.3.3 Test group AP – Climatic |
28 | 6.7.3.4 Test group BP – Mechanical |
30 | 6.7.3.5 Test group CP – Moisture |
31 | 6.7.3.6 Test group DP – Vibration |
33 | 6.7.3.7 Test group EP – Electrical load |
34 | 6.7.3.8 Test group FP – Electrical transmission 6.7.3.9 Test group GP – Transfer impedance and coupling attenuation |
35 | Bibliography |