IEEE Standard Test Procedures for Electric Energy Storage Equipment and Systems for Electric Power Systems Applications
Published By | Publication Date | Number of Pages |
IEEE | 2016 | 72 |
New IEEE Standard – Active. Applications of electric energy storage equipment and systems (ESS) for electric power systems (EPSs) are covered. Testing items and procedures, including type test, production test, installation evaluation, commissioning test at site, and periodic test, are provided in order to verify whethere ESS applied in EPSs meet the safety and reliability requirements of the EPS. Grid operators, ESS manufactures, and ESS operators are for whom this standard is established.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 2030.3™-2016 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
7 | Participants |
8 | Introduction |
9 | Contents |
11 | IMPORTANT NOTICE Overview 1.1 Scope |
12 | 1.2 Purpose 2. Normative references |
13 | 3. Definitions 3.1 Definitions 3.2 Acronyms and abbreviations |
14 | 4. General 4.1 Testing items 4.2 Application |
16 | 5. General technical requirements 5.1 Accuracy of the test result 5.2 Test environment 5.3 Accuracy and calibration of the instruments for test 5.4 Equipment information |
17 | 5.5 Test report 5.6 Technical requirement of the test system 6. Type tests |
18 | 6.1 Temperature stability test |
19 | 6.2 State of charge (SOC) test |
22 | 6.3 Conversion efficiency test |
27 | 6.4 Response time test |
29 | 6.5 Ramp-rate test |
30 | 6.6 Synchronization test |
31 | 6.7 Reconnection after abnormal condition test |
36 | 6.8 Harmonics test |
37 | 6.9 Flicker test 6.10 Voltage unbalance test |
39 | 6.11 Open-phase test |
40 | 6.12 Overcurrent test 6.13 DC injection test 6.14 Response to abnormal voltage condition |
48 | 6.15 Response to abnormal frequency condition |
51 | 6.16 Unintentional islanding test |
52 | 6.17 Low-voltage ride through test (LVRT test) |
55 | 6.18 Interconnection integrity test |
56 | 6.19 Test record 7. Production test 7.1 Insulation test of paralleling equipment |
57 | 7.2 Synchronization test 7.3 Continuous operation test 7.4 Reconnection after abnormal condition test |
58 | 7.5 Response to abnormal voltage condition test |
59 | 7.6 Response to abnormal frequency condition test 7.7 Overcurrent test 7.8 Unintentional islanding test |
60 | 7.9 Low-voltage ride through test 7.10 Test record 8. Installation evaluation 8.1 Operation environment conditions |
61 | 8.2 Grounding 8.3 Isolation device 8.4 Monitoring 8.5 Fault response 8.6 Coordination with EPS reclosing 9. Commissioning test 9.1 General requirements |
62 | 9.2 Calibration and inspection 9.3 Supplemented type test and production test at site 9.4 Insulation test of paralleling equipment |
63 | 9.5 Synchronization test 9.6 Unintentional islanding test 9.7 Stop charging/discharging test |
64 | 9.8 Parameters adjustment 10. Periodic test |
65 | Annex A (informative) Test signals A.1 Magnitude test (ramp function)—general |
67 | A.2 Time test (step function)—general |
70 | Annex B (informative) Quality factor calculation method B.1 Quality factor |
71 | Annex C (informative) Bibliography |
72 | Back cover |