IEEE 62395-1-2024
$47.67
IEEE/IEC International Standard – Electrical Resistance Trace Heating Systems for Industrial and Commercial Applications – Part 1: General and testing requirements (Published)
Published By | Publication Date | Number of Pages |
IEEE | 2024 | 68 |
Revision Standard – Active.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | FRONT COVER |
4 | CONTENTS |
7 | FOREWORD |
9 | INTRODUCTION |
10 | 1 Scope 2 Normative references |
11 | 3 Terms and definitions |
16 | 4 General requirements 4.1 General |
17 | 4.2 Electrically conductive covering 4.3 Electrical circuit protection requirements for branch circuits 4.4 Temperature requirements 4.4.1 General 4.4.2 Stabilized design 4.4.3 Controlled design |
18 | 4.4.4 Controls and monitoring for fire sprinkler systems and safety showers 5 Testing 5.1 Type tests – General |
19 | Tables Table 1 – Trace heater and surface heater types and related attributes |
20 | Table 2 – Applicable tests for trace heaters, surface heaters, and integral components, by trace heater and surface heater type |
21 | 5.2 Type tests – All applications 5.2.1 Dielectric test Table 3 – Test voltages for the dielectric test |
22 | 5.2.2 Electrical insulation resistance test 5.2.3 Flammability test |
24 | Figures Figure 1 – Flammability test |
25 | 5.2.4 Room temperature impact test |
26 | Figure 2 – Example of room temperature impact test apparatus |
27 | 5.2.5 Minimum temperature impact test |
28 | 5.2.6 Deformation test Figure 3 – Example of minimum temperature impact test apparatus |
29 | 5.2.7 Cold bend test Figure 4 – Cold bend test |
30 | 5.2.8 Water resistance test 5.2.9 Integral components resistance to water test Figure 5 – Integral components resistance to water test |
31 | 5.2.10 Verification of rated output Table 4 – Applicable test subclauses for the verification of rated output |
34 | Figure 6 – Verification of rated output |
35 | 5.2.11 Thermal stability of electrical insulating material 5.2.12 Thermal performance test |
37 | 5.2.13 Maximum sheath temperature |
39 | Figure 7 – Verification of sheath temperatures utilizing pipe sculpture fixture |
41 | Figure 8 – Verification of sheath temperatures utilizing plate fixture |
42 | Figure 9 – Verification of sheath temperatures utilizing plate fixture with serpentined sample |
43 | Figure 10 – Plate fixture with two samples crossed over |
44 | Figure 11 – Plate fixture with a single sample crossed over |
48 | 5.2.14 Verification of start-up current 5.2.15 Verification of the electrical resistance of the electrically conductive covering Figure 12 – Maximum sheath temperature using the product approach |
49 | 5.2.16 Test for heating device / heating device set glands – General Table 5 – Pulling forces for strain relief test |
50 | 5.2.17 Connection Integrity (integral components) Figure 13 – Gland temperature measurement – location of thermocouples |
51 | Figure 14 – Typical splice firm attachment apparatus |
52 | 5.3 Type tests – Additional tests for outdoor exposed surface heating installations without thermal insulation 5.3.1 Verification of rated output 5.3.2 Determination of maximum sheath temperature 5.3.3 Increased moisture resistance test |
53 | 5.3.4 UV and condensation test 5.3.5 Resistance to cutting test 5.3.6 Abrasion test |
54 | 5.3.7 Tension test 5.3.8 Rail system voltage spike test Figure 15 – Abrasion test |
55 | 5.3.9 Rail system over-voltage test 5.4 Type tests – Additional tests and test modifications for embedded heating applications 5.4.1 Verification of rated output 5.4.2 Determination of maximum sheath temperature 5.4.3 Resistance to cutting test 5.4.4 Flammability test 5.5 Type tests – Additional tests for applications of trace heaters internal to conduit and piping 5.5.1 Verification of rated output 5.5.2 Determination of maximum sheath temperature |
56 | 5.5.3 Increased moisture resistance test 5.5.4 Pull-strength test |
57 | 5.6 Type tests – Additional requirements for sprinkler systems 5.6.1 Normal and abnormal operation test 5.6.2 Normal operation test with controller |
58 | Figure 16 – Sprinkler system temperature control test – branch line arrangement |
59 | Figure 17 – Sprinkler system temperature control test –branch line – alternative arrangement Figure 18 – Sprinkler system temperature control test – supply pipe arrangement |
60 | 5.6.3 Abnormal operation test with controller malfunctioning 5.6.4 Abnormal operation test without controller 5.6.5 Testing for control systems for fire sprinkler systems 5.7 Routine tests 5.7.1 Dielectric test |
61 | 5.7.2 Verification of rated output 6 Marking 6.1 General 6.2 Product markings |
62 | 7 Installation instructions Table 6 – Product marking |
64 | Annex A (informative) Determination of test samples for type testing Table A.1 – Determination of test samples |
66 | Bibliography |