{"id":12718,"date":"2024-10-16T21:09:02","date_gmt":"2024-10-16T21:09:02","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-22-05-2005\/"},"modified":"2024-10-24T11:44:07","modified_gmt":"2024-10-24T11:44:07","slug":"asme-b30-22-05-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-22-05-2005\/","title":{"rendered":"ASME B30.22 05 2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS CONTENTS FIGURES FIGURES <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD FOREWORD <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | COMMITTEE ROSTER COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | B30 STANDARD INTRODUCTION B30 STANDARD INTRODUCTION SECTION I: SCOPE SECTION I: SCOPE SECTION II: SCOPE EXCLUSIONS SECTION II: SCOPE EXCLUSIONS SECTION III: PURPOSE SECTION III: PURPOSE SECTION IV: USE BY REGULATORY AGENCIES SECTION IV: USE BY REGULATORY AGENCIES <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | SECTION V: EFFECTIVE DATE SECTION V: EFFECTIVE DATE SECTION VI: REQUIREMENTS AND RECOMMENDATIONS SECTION VI: REQUIREMENTS AND RECOMMENDATIONS SECTION VII: USE OF MEASUREMENT UNITS SECTION VII: USE OF MEASUREMENT UNITS SECTION VIII: REQUESTS FOR REVISION SECTION VIII: REQUESTS FOR REVISION SECTION IX: REQUESTS FOR INTERPRETATION SECTION IX: REQUESTS FOR INTERPRETATION SECTION X: ADDITIONAL GUIDANCE SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | ASME B30.22-2005 SUMMARY OF CHANGES ASME B30.22-2005 SUMMARY OF CHANGES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | ARTICULATING BOOM CRANES ARTICULATING BOOM CRANES Chapter 22-0 Scope, Definitions, and References Chapter 22-0 Scope, Definitions, and References SECTION 22-0.1: SCOPE OF B30.22 SECTION 22-0.1: SCOPE OF B30.22 SECTION 22-0.2: DEFINITIONS SECTION 22-0.2: DEFINITIONS 22-0.2.1 Types of Articulating Boom Cranes 22-0.2.1 Types of Articulating Boom Cranes 22-0.2.2 General Definitions 22-0.2.2 General Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1 Commercial Truck-Mounted Standard Ground Control 1 Commercial Truck-Mounted Standard Ground Control <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 2 Commercial Truck-Mounted Top Seat Control 2 Commercial Truck-Mounted Top Seat Control <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3 Commercial Truck-Mounted Remote Control 3 Commercial Truck-Mounted Remote Control 4 Stationary Installation 4 Stationary Installation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5 Rail Car Installation 5 Rail Car Installation 6 Trailer-Mounted 6 Trailer-Mounted 7 Traveling Rail Base-Mounted on Trailer 7 Traveling Rail Base-Mounted on Trailer 8 Off-Road Vehicle 8 Off-Road Vehicle <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 9 Wheel-Mounted Off-Road Dual Control Station 9 Wheel-Mounted Off-Road Dual Control Station 10 Wheel-Mounted Off-Road Single Control Station 10 Wheel-Mounted Off-Road Single Control Station 11 Crawler-Mounted Off-Road Single Control Station 11 Crawler-Mounted Off-Road Single Control Station <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | SECTION 22-0.3: LEGEND FOR FIGS. 12, 13, 14, and 15 SECTION 22-0.3: LEGEND FOR FIGS. 12, 13, 14, and 15 <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 12 Definitions of Specifications for Articulating Cranes 12 Definitions of Specifications for Articulating Cranes <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 13 Hook Approach 13 Hook Approach 14 Elevation Below Horizontal 14 Elevation Below Horizontal 15 Elevation Above Horizontal 15 Elevation Above Horizontal <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | SECTION 22-0.4: NOMENCLATURE FOR ARTICULATING CRANES SECTION 22-0.4: NOMENCLATURE FOR ARTICULATING CRANES 16 Nomenclature for Articulating Cranes 16 Nomenclature for Articulating Cranes <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | SECTION 22-0.5: REFERENCES SECTION 22-0.5: REFERENCES <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Chapter 22-1 Construction and Characteristics Chapter 22-1 Construction and Characteristics SECTION 22-1.1: LOAD RATINGS SECTION 22-1.1: LOAD RATINGS 22-1.1.1 Load Ratings Where Stability Governs Lifting Performance 22-1.1.1 Load Ratings Where Stability Governs Lifting Performance 22-1.1.2 Load Ratings Where Structural Competence Governs Lifting Performance 22-1.1.2 Load Ratings Where Structural Competence Governs Lifting Performance 22-1.1.3 Load Rating Chart 22-1.1.3 Load Rating Chart <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | SECTION 22-1.2: BOOM LIFT, BOOM TELESCOPING, AND LOAD HOIST MECHANISMS SECTION 22-1.2: BOOM LIFT, BOOM TELESCOPING, AND LOAD HOIST MECHANISMS 22-1.2.1 Inner, Outer, and Jib Boom Lift Mechanism 22-1.2.1 Inner, Outer, and Jib Boom Lift Mechanism 22-1.2.2 Telescoping Booms 22-1.2.2 Telescoping Booms 22-1.2.3 Load Hoist Mechanism Load Hoist Equipped Machines Only 22-1.2.3 Load Hoist Mechanism Load Hoist Equipped Machines Only SECTION 22-1.3: SWING MECHANISM SECTION 22-1.3: SWING MECHANISM 22-1.3.1 Swing Control 22-1.3.1 Swing Control 22-1.3.2 Swing Braking Means and Locking Devices 22-1.3.2 Swing Braking Means and Locking Devices SECTION 22-1.4: CRANE TRANSPORT SECTION 22-1.4: CRANE TRANSPORT SECTION 22-1.5: ROPE AND REEVING ACCESSORIES SECTION 22-1.5: ROPE AND REEVING ACCESSORIES 22-1.5.1 Rope Design Factors 22-1.5.1 Rope Design Factors <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 22-1.5.2 Ropes 22-1.5.2 Ropes 22-1.5.3 Reeving Accessories 22-1.5.3 Reeving Accessories 22-1.5.4 Sheaves 22-1.5.4 Sheaves 22-1.5.5 Sheave Sizes 22-1.5.5 Sheave Sizes 22-1.5.6 Load Hooks, Ball Assemblies, and Load Blocks 22-1.5.6 Load Hooks, Ball Assemblies, and Load Blocks SECTION 22-1.6: CONTROLS SECTION 22-1.6: CONTROLS 22-1.6.1 General 22-1.6.1 General <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 22-1.6.2 Control Forces and Movements 22-1.6.2 Control Forces and Movements SECTION 22-1.7: INSTALLATION SECTION 22-1.7: INSTALLATION 22-1.7.1 Mechanical Testing 22-1.7.1 Mechanical Testing 22-1.7.2 Stability Testing 22-1.7.2 Stability Testing 22-1.7.3 Exhaust Gases 22-1.7.3 Exhaust Gases SECTION 22-1.8: CONSTRUCTION SECTION 22-1.8: CONSTRUCTION 22-1.8.1 Welding 22-1.8.1 Welding 22-1.8.2 Hydraulic and Pneumatic Line Protection 22-1.8.2 Hydraulic and Pneumatic Line Protection 22-1.8.3 Lubricating Points 22-1.8.3 Lubricating Points 22-1.8.4 Stabilizers 22-1.8.4 Stabilizers 22-1.8.5 Design Requirements 22-1.8.5 Design Requirements 22-1.8.6 Miscellaneous Equipment 22-1.8.6 Miscellaneous Equipment SECTION 22-1.9 OPERATING MANUAL SECTION 22-1.9 OPERATING MANUAL <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Chapter 22-2 Inspection, Testing, and Maintenance Chapter 22-2 Inspection, Testing, and Maintenance SECTION 22-2.1: INSPECTION SECTION 22-2.1: INSPECTION 22-2.1.1 General 22-2.1.1 General 22-2.1.2 Inspection Classification 22-2.1.2 Inspection Classification 22-2.1.3 Frequent Inspection 22-2.1.3 Frequent Inspection 22-2.1.4 Periodic Inspection 22-2.1.4 Periodic Inspection <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 22-2.1.5 Cranes Not in Regular Use 22-2.1.5 Cranes Not in Regular Use 22-2.1.6 Inspection Records 22-2.1.6 Inspection Records SECTION 22-2.2: TESTING SECTION 22-2.2: TESTING 22-2.2.1 Operational Tests 22-2.2.1 Operational Tests 22-2.2.2 Load Test 22-2.2.2 Load Test SECTION 22-2.3: MAINTENANCE SECTION 22-2.3: MAINTENANCE 22-2.3.1 Preventive Maintenance 22-2.3.1 Preventive Maintenance 22-2.3.2 Maintenance Procedure 22-2.3.2 Maintenance Procedure <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 22-2.3.3 Adjustments and Repairs 22-2.3.3 Adjustments and Repairs 22-2.3.4 Lubrication 22-2.3.4 Lubrication SECTION 22-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE SECTION 22-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE 22-2.4.1 General 22-2.4.1 General 22-2.4.2 Inspection 22-2.4.2 Inspection <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 22-2.4.3 Rope Replacement 22-2.4.3 Rope Replacement 22-2.4.4 Rope Maintenance 22-2.4.4 Rope Maintenance <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Chapter 22-3 Operation Chapter 22-3 Operation SECTION 22-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS AND OPERATING PRACTICES SECTION 22-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS AND OPERATING PRACTICES 22-3.1.1 Operators 22-3.1.1 Operators 22-3.1.2 Qualifications for Operators 22-3.1.2 Qualifications for Operators 22-3.1.3 Conduct of Operators 22-3.1.3 Conduct of Operators <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | SECTION 22-3.2: OPERATING PRACTICES SECTION 22-3.2: OPERATING PRACTICES 22-3.2.1 Handling the Load 22-3.2.1 Handling the Load SECTION 22-3.3: MISCELLANEOUS SECTION 22-3.3: MISCELLANEOUS 22-3.3.1 Operating Near Electric Power Lines 22-3.3.1 Operating Near Electric Power Lines <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 17 Danger Zone for Cranes and Lifted Loads Operating Near Electrical Transmission Lines 17 Danger Zone for Cranes and Lifted Loads Operating Near Electrical Transmission Lines <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | TABLE TABLE 1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered 1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | ASME B30.22-2005 INTERPRETATIONS ASME B30.22-2005 INTERPRETATIONS <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Interpretation: 22-5 Interpretation: 22-5 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.22 Articulating Boom Cranes <\/b><\/p>\n |