{"id":12724,"date":"2024-10-16T21:09:09","date_gmt":"2024-10-16T21:09:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-8-04-2004\/"},"modified":"2024-10-24T11:44:07","modified_gmt":"2024-10-24T11:44:07","slug":"asme-b30-8-04-2004","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-8-04-2004\/","title":{"rendered":"ASME B30.8 04 2004"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS
CONTENTS
FIGURES
FIGURES <\/td>\n<\/tr>\n
5<\/td>\nFOREWORD
FOREWORD <\/td>\n<\/tr>\n
6<\/td>\nCOMMITTEE ROSTER
COMMITTEE ROSTER <\/td>\n<\/tr>\n
8<\/td>\nINTRODUCTION
INTRODUCTION
GENERAL
GENERAL <\/td>\n<\/tr>\n
9<\/td>\nSECTION I: SCOPE
SECTION I: SCOPE
SECTION II: PURPOSE
SECTION II: PURPOSE
SECTION III: INTERPRETATIONS
SECTION III: INTERPRETATIONS
SECTION IV: NEW AND EXISTING INSTALLATIONS
SECTION IV: NEW AND EXISTING INSTALLATIONS <\/td>\n<\/tr>\n
10<\/td>\nSECTION V: MANDATORY AND ADVISORY RULES
SECTION V: MANDATORY AND ADVISORY RULES
SECTION VI: METRIC CONVERSIONS
SECTION VI: METRIC CONVERSIONS <\/td>\n<\/tr>\n
11<\/td>\nSUMMARY OF CHANGES
SUMMARY OF CHANGES <\/td>\n<\/tr>\n
12<\/td>\nChapter 8-0 Scope, Definitions, and References
Chapter 8-0 Scope, Definitions, and References
SECTION 8-0.1: SCOPE OF B30.8
SECTION 8-0.1: SCOPE OF B30.8
SECTION 8-0.2: DEFINITIONS
SECTION 8-0.2: DEFINITIONS
1 Floating Crane
1 Floating Crane <\/td>\n<\/tr>\n
13<\/td>\n2 Barge-Mounted Shearleg
2 Barge-Mounted Shearleg
3 Barge-Mounted Land Crane
3 Barge-Mounted Land Crane
4 Floating Stiffleg Derrick
4 Floating Stiffleg Derrick
5 Floating A-Frame Derrick
5 Floating A-Frame Derrick <\/td>\n<\/tr>\n
15<\/td>\nSECTION 8-0.3: REFERENCES
SECTION 8-0.3: REFERENCES
6 Reach for Floating Cranes
6 Reach for Floating Cranes <\/td>\n<\/tr>\n
17<\/td>\nChapter 8-1 Construction and Installation
Chapter 8-1 Construction and Installation
SECTION 8-1.1: LOAD RATINGS AND MARKINGS
SECTION 8-1.1: LOAD RATINGS AND MARKINGS
8-1.1.1 Basis
8-1.1.1 Basis
8-1.1.2 Rated Loads
8-1.1.2 Rated Loads
8-1.1.3 Rated Load Marking
8-1.1.3 Rated Load Marking
SECTION 8-1.2: CONSTRUCTION AND LOADING CONDITIONS
SECTION 8-1.2: CONSTRUCTION AND LOADING CONDITIONS
8-1.2.1 Structural Competence
8-1.2.1 Structural Competence
8-1.2.2 Operational Criteria
8-1.2.2 Operational Criteria <\/td>\n<\/tr>\n
18<\/td>\nSECTION 8-1.3: GENERAL REQUIREMENTS FOR PONTOONS AND BARGES
SECTION 8-1.3: GENERAL REQUIREMENTS FOR PONTOONS AND BARGES
8-1.3.1 Machinery and Electrical Equipment
8-1.3.1 Machinery and Electrical Equipment
8-1.3.2 Compartments
8-1.3.2 Compartments
8-1.3.3 Manholes and Hatches
8-1.3.3 Manholes and Hatches
8-1.3.4 Fittings
8-1.3.4 Fittings
8-1.3.5 Life Preservers
8-1.3.5 Life Preservers
8-1.3.6 Rescue Skiff
8-1.3.6 Rescue Skiff
SECTION 8-1.4: GENERAL REQUIREMENTS FOR CRANES AND DERRICKS
SECTION 8-1.4: GENERAL REQUIREMENTS FOR CRANES AND DERRICKS
8-1.4.1 Guards
8-1.4.1 Guards <\/td>\n<\/tr>\n
19<\/td>\n8-1.4.2 Lubrication
8-1.4.2 Lubrication
8-1.4.3 Miscellaneous Equipment
8-1.4.3 Miscellaneous Equipment
SECTION 8-1.5: VERTICAL CLEARANCE
SECTION 8-1.5: VERTICAL CLEARANCE
SECTION 8-1.6: BOOM HOIST LUFFING HOIST AND LOAD HOIST MECHANISMS
SECTION 8-1.6: BOOM HOIST LUFFING HOIST AND LOAD HOIST MECHANISMS
8-1.6.1 Boom Hoist Luffing Hoist
8-1.6.1 Boom Hoist Luffing Hoist
8-1.6.2 Load Hoist
8-1.6.2 Load Hoist <\/td>\n<\/tr>\n
20<\/td>\nSECTION 8-1.7: SWING MECHANISM
SECTION 8-1.7: SWING MECHANISM
8-1.7.1 Swing Control
8-1.7.1 Swing Control
8-1.7.2 Swing Brake and Locking Device
8-1.7.2 Swing Brake and Locking Device
SECTION 8-1.8: CONTROLS
SECTION 8-1.8: CONTROLS
8-1.8.1 General
8-1.8.1 General
8-1.8.2 Power Plant Control
8-1.8.2 Power Plant Control
8-1.8.3 Control Forces and Movements
8-1.8.3 Control Forces and Movements <\/td>\n<\/tr>\n
21<\/td>\n8-1.8.4 Engine Clutch
8-1.8.4 Engine Clutch
8-1.8.5 Electric Drive Control Panels
8-1.8.5 Electric Drive Control Panels
8-1.8.6 Resistors
8-1.8.6 Resistors
8-1.8.7 Switches
8-1.8.7 Switches
SECTION 8-1.9: ROPES AND REEVING ACCESSORIES
SECTION 8-1.9: ROPES AND REEVING ACCESSORIES
8-1.9.1 Rope Design Factors
8-1.9.1 Rope Design Factors
8-1.9.2 Ropes: General
8-1.9.2 Ropes: General
8-1.9.3 Reeving Accessories
8-1.9.3 Reeving Accessories <\/td>\n<\/tr>\n
22<\/td>\n8-1.9.4 Sheaves
8-1.9.4 Sheaves
8-1.9.5 Sheave Sizes
8-1.9.5 Sheave Sizes
8-1.9.6 Load Hooks, Ball Assemblies, and Load Blocks
8-1.9.6 Load Hooks, Ball Assemblies, and Load Blocks
SECTION 8-1.10: CABS
SECTION 8-1.10: CABS
8-1.10.1 Construction
8-1.10.1 Construction
8-1.10.2 Platforms to Cab
8-1.10.2 Platforms to Cab
7 Dead Ending Rope in a Socket
7 Dead Ending Rope in a Socket <\/td>\n<\/tr>\n
23<\/td>\n8-1.10.3 Access to Cab
8-1.10.3 Access to Cab
8-1.10.4 Cab Roof
8-1.10.4 Cab Roof
8-1.10.5 Exhaust Gases
8-1.10.5 Exhaust Gases
SECTION 8-1.11: GENERAL REQUIREMENTS FOR BOOMS
SECTION 8-1.11: GENERAL REQUIREMENTS FOR BOOMS
8-1.11.1 Booms
8-1.11.1 Booms <\/td>\n<\/tr>\n
24<\/td>\nChapter 8-2 Inspection, Testing, and Maintenance
Chapter 8-2 Inspection, Testing, and Maintenance
SECTION 8-2.1: INSPECTION — GENERAL
SECTION 8-2.1: INSPECTION — GENERAL
8-2.1.1 Inspection Classifications
8-2.1.1 Inspection Classifications
8-2.1.2 Frequent Inspection
8-2.1.2 Frequent Inspection
8-2.1.3 Periodic Inspection
8-2.1.3 Periodic Inspection <\/td>\n<\/tr>\n
25<\/td>\n8-2.1.4 Cranes or Derricks Not in Regular Use
8-2.1.4 Cranes or Derricks Not in Regular Use
8-2.1.5 Inspection Records
8-2.1.5 Inspection Records
SECTION 8-2.2: TESTING
SECTION 8-2.2: TESTING
8-2.2.1 Operational Tests
8-2.2.1 Operational Tests <\/td>\n<\/tr>\n
26<\/td>\n8-2.2.2 Load Test
8-2.2.2 Load Test
SECTION 8-2.3: MAINTENANCE
SECTION 8-2.3: MAINTENANCE
8-2.3.1 Preventive Maintenance
8-2.3.1 Preventive Maintenance
8-2.3.2 Maintenance Procedure
8-2.3.2 Maintenance Procedure
8-2.3.3 Adjustments and Repairs
8-2.3.3 Adjustments and Repairs
8-2.3.4 Lubrication
8-2.3.4 Lubrication <\/td>\n<\/tr>\n
27<\/td>\nSECTION 8-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
SECTION 8-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
8-2.4.1 Frequent Inspection
8-2.4.1 Frequent Inspection
8-2.4.2 Periodic Inspection
8-2.4.2 Periodic Inspection
8-2.4.3 Rope Replacement
8-2.4.3 Rope Replacement
8 Core Failure in 19 7 Rotation-Resistant Rope
8 Core Failure in 19 7 Rotation-Resistant Rope <\/td>\n<\/tr>\n
28<\/td>\n8-2.4.4 Ropes Not in Regular Use
8-2.4.4 Ropes Not in Regular Use
8-2.4.5 Inspection Records
8-2.4.5 Inspection Records
8-2.4.6 Rope Maintenance
8-2.4.6 Rope Maintenance <\/td>\n<\/tr>\n
29<\/td>\nChapter 8-3 Operation
Chapter 8-3 Operation
SECTION 8-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS
SECTION 8-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS
8-3.1.1 Operators
8-3.1.1 Operators
8-3.1.2 Qualifications for Operators
8-3.1.2 Qualifications for Operators
8-3.1.3 Conduct of Operators
8-3.1.3 Conduct of Operators <\/td>\n<\/tr>\n
30<\/td>\nSECTION 8-3.2: OPERATING PRACTICES
SECTION 8-3.2: OPERATING PRACTICES
8-3.2.1 Load Weight
8-3.2.1 Load Weight
8-3.2.2 Attaching the Load
8-3.2.2 Attaching the Load
8-3.2.3 Moving the Load
8-3.2.3 Moving the Load <\/td>\n<\/tr>\n
31<\/td>\n8-3.2.4 Holding the Load
8-3.2.4 Holding the Load
8-3.2.5 Use of Winch Heads
8-3.2.5 Use of Winch Heads
8-3.2.6 Securing Booms
8-3.2.6 Securing Booms
8-3.2.7 Personnel Access
8-3.2.7 Personnel Access
8-3.2.8 Personnel Lifting
8-3.2.8 Personnel Lifting <\/td>\n<\/tr>\n
32<\/td>\nSECTION 8-3.3: SIGNALS
SECTION 8-3.3: SIGNALS
8-3.3.1 Standard Signals
8-3.3.1 Standard Signals
8-3.3.2 Hand Signals
8-3.3.2 Hand Signals
8-3.3.3 Bell Signals
8-3.3.3 Bell Signals
8-3.3.4 Special Signals
8-3.3.4 Special Signals
8-3.3.5 Instructions
8-3.3.5 Instructions
SECTION 8-3.4: MISCELLANEOUS
SECTION 8-3.4: MISCELLANEOUS
8-3.4.1 Fire Extinguishers
8-3.4.1 Fire Extinguishers
8-3.4.2 Refueling
8-3.4.2 Refueling
8-3.4.3 Operating Near Electric Power Lines
8-3.4.3 Operating Near Electric Power Lines <\/td>\n<\/tr>\n
33<\/td>\n8-3.4.4 Cab or Operating Enclosure
8-3.4.4 Cab or Operating Enclosure
TABLE
TABLE
1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered
1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered <\/td>\n<\/tr>\n
34<\/td>\n9 Standard Hand Signals for Controlling Crane and Derrick Operations
9 Standard Hand Signals for Controlling Crane and Derrick Operations <\/td>\n<\/tr>\n
37<\/td>\n10 Danger Zone for Cranes, Derricks, and Lifted Loads Operating Near Electrical Transmission Lines
10 Danger Zone for Cranes, Derricks, and Lifted Loads Operating Near Electrical Transmission Lines <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.8 Floating Cranes and Floating Derricks <\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2004<\/td>\n42<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":12725,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-12724","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/12724","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/12725"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=12724"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=12724"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=12724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}