{"id":144113,"date":"2024-10-19T08:25:07","date_gmt":"2024-10-19T08:25:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-1-1996\/"},"modified":"2024-10-25T00:41:07","modified_gmt":"2024-10-25T00:41:07","slug":"ashrae-guideline-1-1996","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-1-1996\/","title":{"rendered":"ASHRAE Guideline 1 1996"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | DISCLAIMER <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | ASHRAE Guideline Project Committee 1-1989R <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword 1 Purpose 2 Scope 3 Utilization <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4 Definitions 5 PROGRAM PHASE 5.1 Introduction <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 5.2 Program-Phase Procedure <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 5.3 Systems Manual 6 DESIGN PHASE 6.1 Introduction 6.2 Design-Phase Procedures 7 CONSTRUCTION PHASE 7.1 Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 7.2 Construction-Phase Procedures 7.3 Submittals <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 7.4 Commissioning Plan 7.5 Documentation 8 ACCEPTANCE PHASE 8.1 Introduction 8.2 Prerequisites to Acceptance Procedures 8.3 Verification <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 8.4 Certificate of Readiness 8.5 Functional Performance Testing <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 8.6 Documentation 8.7 Final Acceptance 9 POST-ACCEPTANCE COMMISSIONING 9.1 Introduction 9.2 Post-Acceptance Commissioning Requirements and Procedures <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 9.3 Documentation 10 COMMISSIONING EXISTING BUILDINGS 10.1 Introduction 10.2 Program for Existing Buildings 11 OPERATIONS AND MAINTENANCE TRAINING PROGRAM 11.1 Introduction <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 11.2 Scope of Training 12 COMMISSIONING DOCUMENTATION 12.1 Introduction 12.2 Program-Phase Documentation <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 12.3 Design-Phase Documentation 12.4 Construction-Phase Documentation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 12.5 Acceptance-Phase Documentation <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 12.6 Systems Manual 12.7 Post-Acceptance-Phase Documentation 13 REFERENCES <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | ANNEXES A. Discussion of the HVAC Commissioning Process 1. Introduction 2. Responsibilities of the Participants in a Sample Comprehensive Commissioning Process <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 3. Sample Comprehensive HVAC Commissioning Process Flow Chart and Organizational Structure 4. Example Request for Commissioning Services <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5. Sample Preliminary Commissioning Plan <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6. Commissioning Specification <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 7. Acceptance-Phase Procedures <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | B. Commissioning an HVAC System: Costs and Benefits of the Process <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | C. Indoor Air Quality and HVAC Commissioning <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | D. Energy-Efficiency Reference Information <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASHRAE Guideline 1-1996: The HVAC Commissioning Process<\/b><\/p>\n |