{"id":160713,"date":"2024-10-19T09:39:14","date_gmt":"2024-10-19T09:39:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-311-5-04\/"},"modified":"2024-10-25T01:57:55","modified_gmt":"2024-10-25T01:57:55","slug":"aci-311-5-04","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-311-5-04\/","title":{"rendered":"ACI 311.5 04"},"content":{"rendered":"
This guide is intended for use in establishing basic duties and reports required of inspection personnel. It can be used for all types and sizes of projects but should be supplemented with additional inspection requirements when the complexity of the project so dictates. Refer to ACI 311.4R for guidance on additional requirements and to SP-2 for more detailed information on concrete production practices and inspection and testing of concrete. This guide recommends minimum requirements for inspection at the concrete plant when such inspections are required by specifications or the owner. It also recommends minimum requirements for field and laboratory testing of concrete. It is intended for use by specifiers, architects, engineers, owners, contractors, or other groups needing to monitor the ready-mixed concrete producers\u2019 activities at the concrete plant and concreting activities at the project site through the use of an independent inspection agency or in-house inspection organization. This guide also recommends minimum testing laboratory qualifications, minimum inspector qualifications, duties, and reports. Keywords: batch plants; contract documents; curing; high-strength concrete; quality control; ready-mixed concrete; test.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | CONTENTS CHAPTER 1\u2014 PLANT INSPECTION OF READY- MIXED CONCRETE 1.1- Introduction and scope <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | 1.2\u2014Inspector qualifications 1.3\u2014Inspector duties 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.3.9 1.3.10 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 1.4\u2014Reports 1.4.1 1.4.2 CHAPTER 2\u2014 TESTING OF READY-MIXED CONCRETE 2.1- Introduction and scope 2.2\u2014Qualifications 2.3\u2014Testing laboratory 2.4\u2014Duties 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 2.4.8 2.4.9 <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | 2.4.10 2.4.11 2.4.12 2.4.13 2.4.14 2.5\u2014Testing high-strength concrete 2.5.1 2.5.2 2.5.3 2.6\u2014Reports 2.6.1 2.6.2 2.6.3 <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 2.6.4 CHAPTER 3\u2014 REFERENCES 3.1- Referenced standards and reports 3.2\u2014Other references <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3.3\u2014Laboratory evaluation and accreditation agencies <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 311.5-04: Guide for Concrete Plant Inspection and Testing of Ready-Mixed Concrete<\/b><\/p>\n |