{"id":198411,"date":"2024-10-19T12:37:50","date_gmt":"2024-10-19T12:37:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aami-13408-6-2005-ra-2013\/"},"modified":"2024-10-25T05:10:52","modified_gmt":"2024-10-25T05:10:52","slug":"aami-13408-6-2005-ra-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aami\/aami-13408-6-2005-ra-2013\/","title":{"rendered":"AAMI 13408 6 2005 RA 2013"},"content":{"rendered":"
Specifies the requirements for isolator systems used for aseptic processing and offers guidance on qualification, bio-decontamination, validation, operation and control of isolator systems used for aseptic processing of health care products. The document focuses on the use of isolator systems to maintain aseptic conditions; this may include applications for hazardous materials.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | ANSI\/AAMI\/ISO 13408-6:2005\/(R)2013, Aseptic processing of health care products \u2014 Part 6: Isolator systems <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Objectives and uses of AAMI standards and recommended practices <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | AAMI Standard Copyright information <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Glossary of equivalent standards <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Committee representation <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Background of ANSI\/AAMI adoption of ISO 13408-6:2005 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4 Quality system elements 4.1 General 4.2 Management responsibility <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.3 Design control 4.4 Measuring instruments and measuring systems 5 Design of isolator systems 5.1 General 5.2 Types of isolators 5.2.1 Closed 5.2.2 Open <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3 Materials of construction 5.4 Air-handling system 5.4.1 Air change rate 5.4.2 Air flow pattern 5.4.3 Temperature\/humidity 5.4.4 Particulate air specifications 5.4.5 Recirculation of air <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.4.6 Pressure differentials 5.4.7 Filter maintenance 5.5 Operator interface 5.5.1 Isolator gloves\/sleeves 5.5.2 Suits\/half-suits 5.5.3 Access to the isolator <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.6 Ancillary equipment 5.6.1 Portable and mobile equipment 5.6.2 Transfer ports 6 Facility requirements 6.1 Surrounding room classification 6.2 Process utilities <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7 User requirements 7.1 Product\/process application 7.2 Ergonomics 7.3 Cleaning 7.3.1 General 7.3.2 Clean-in-place 7.3.3 Manual cleaning 7.3.4 Cleaning agent <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.4 Bio-decontamination 7.4.1 General 7.4.2 Sterilization-in-place 7.4.3 Selection of bio-decontamination agent <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.4.4 Bio-decontamination agent generation and testing 7.4.5 Bio-decontamination parameters <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.4.6 Aeration and residue limits 7.4.7 Spore log reduction 7.4.8 Surface bio-decontamination of goods 7.4.9 Surface bio-decontamination of container with sterile product 8 Validation 8.1 General <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.2 Design qualification 8.3 Installation qualification 8.3.1 General 8.3.2 Installation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.4 Operational qualification <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.5 Performance qualification 8.5.1 General 8.5.2 Cleaning 8.5.3 Bio-decontamination <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.5.4 Process simulation tests 8.6 Review and approval of validation 8.7 Requalification <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9 Routine monitoring and control 9.1 Procedures 9.2 System integrity 9.3 Bio-decontamination process monitoring 9.4 Environmental monitoring 9.5 Change control <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.6 Maintenance and calibration 10 Personnel training <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Bibliography <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | ANSI\/AAMI\/ISO 13408-6:2005, Aseptic processing of health care products \u2014 Part 6: Isolator systems Amendment 1 <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | AAMI Standard Copyright information <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Committee representation <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Background on AAMI adoption of ISO 13408-6:2005 Amd. 1 <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Amendment 1 \n <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ANSI\/AAMI\/ISO 13408-6:2005\/(R)2013 & A1:2013 – Aseptic processing of health care products – Part 6: Isolator systems<\/b><\/p>\n |