{"id":214131,"date":"2024-10-19T13:52:30","date_gmt":"2024-10-19T13:52:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-7533-32005a12009\/"},"modified":"2024-10-25T06:50:12","modified_gmt":"2024-10-25T06:50:12","slug":"bs-7533-32005a12009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-7533-32005a12009\/","title":{"rendered":"BS 7533-3:2005+A1:2009"},"content":{"rendered":"

This part of BS 7533 gives recommendations for the laying of conventional and permeable pavements using precast concrete paving blocks conforming to BS EN 1338 and clay pavers conforming to BS EN 1344.<\/p>\n

This standard is intended for flexible pavements for roads, industrial areas and other paved surfaces subjected to all categories of static and vehicular loading and pedestrian traffic.<\/p>\n

The principles given apply to all shapes and sizes of paving units covered by BS EN 1338 and BS EN 1344.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nBRITISH STANDARD <\/td>\n<\/tr>\n
2<\/td>\nCommittees responsible for this British Standard <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\n1 Scope
2 Normative references
3 Terms and definitions
paving unit
restraint
edge restraint
intermediate restraint <\/td>\n<\/tr>\n
6<\/td>\ntemporary restraint
interlock
laying course
laying face
roadbase
sub-base
subgrade
capping layer
surface course
inboard cut
laying pattern
jointing material
joint width <\/td>\n<\/tr>\n
7<\/td>\nvoid
conventional pavement
permeable pavement
mechanical laying
4 Structure of pavement
Typical cross-section of pavement
5 Construction of pavement
5.1 Subgrade, sub-base and roadbase <\/td>\n<\/tr>\n
8<\/td>\n5.2 Restraint <\/td>\n<\/tr>\n
9<\/td>\n5.3 Laying course <\/td>\n<\/tr>\n
11<\/td>\n5.4 Installation of surface course <\/td>\n<\/tr>\n
14<\/td>\n6 Construction in adverse weather conditions
6.1 Conventional pavements
6.2 Permeable pavements
7 Additional work after early trafficking
7.1 General
7.2 Conventional pavements
7.3 Permeable pavements <\/td>\n<\/tr>\n
15<\/td>\n(normative) Procedure for constructing a pavement
(normative) Procedure for constructing a pavement
Flow chart of the procedure for constructing a pavement <\/td>\n<\/tr>\n
16<\/td>\n(normative) Tolerance of the surface levels of the different layers of a pavement and the surface regularity of the surface course
(normative) Tolerance of the surface levels of the different layers of a pavement and the surface regularity of the surface course
Tolerance of the surface levels of the different layers of a pavement
Tolerance of surface levels
Surface regularity of the surface course
Surface regularity of the surface course <\/td>\n<\/tr>\n
17<\/td>\n(informative) Typical details around structures within pavements
(informative) Typical details around structures within pavements
Typical restraint details <\/td>\n<\/tr>\n
18<\/td>\nTypical restraint details <\/td>\n<\/tr>\n
19<\/td>\nDetail at ironwork <\/td>\n<\/tr>\n
20<\/td>\nTypical detail around drainage channels <\/td>\n<\/tr>\n
21<\/td>\n(normative) Pavement materials
(normative) Pavement materials
Conventional pavements
Laying course material
Laying course application
Grading for laying course material for conventional pavements [BS EN 12620:2002 GF85 0\/4 (MP) fine aggregate]
Fines content of laying course material for conventional pavements <\/td>\n<\/tr>\n
22<\/td>\nJointing material
Grading for jointing material for conventional pavements [BS EN 12620:2002 GF 85 0\/1 (FP) fine aggregate]
Permeable pavements
Sub-base material
Grading for sub-base material for permeable pavements [BS EN 12620:2002 GC 90\/15 4\/40 and 4\/20 coarse aggregate]
Laying course material <\/td>\n<\/tr>\n
23<\/td>\nGrading for laying course material for permeable pavements [BS EN 12620:2002 GC 80\/20 2\/6.3 coarse aggregate]
Jointing and void filling material <\/td>\n<\/tr>\n
24<\/td>\n(informative) Laying patterns
(informative) Laying patterns
Laying patterns <\/td>\n<\/tr>\n
25<\/td>\nLaying patterns at edges <\/td>\n<\/tr>\n
26<\/td>\nLaying patterns that incorporate complimentary fittings <\/td>\n<\/tr>\n
27<\/td>\nLaying patterns that incorporate inboard cutting at edges
(normative) Plate compactor details
(normative) Plate compactor details
Compactor details <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Pavements constructed with clay, natural stone or concrete pavers – Code of practice for laying precast concrete paving blocks and clay pavers for flexible pavements<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2009<\/td>\n30<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":214132,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1301,2641],"product_tag":[],"class_list":{"0":"post-214131","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-93-080-20","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/214131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/214132"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=214131"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=214131"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=214131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}