{"id":255306,"date":"2024-10-19T16:52:35","date_gmt":"2024-10-19T16:52:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-16-30317775-dc\/"},"modified":"2024-10-25T12:19:33","modified_gmt":"2024-10-25T12:19:33","slug":"bsi-16-30317775-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-16-30317775-dc\/","title":{"rendered":"BSI 16\/30317775 DC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4 Abbreviated terms 5 Requirements for schedules 5.1 Schedules for establishing time-based behaviour <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 5.2 Relation between schedules and directly set values and parameters of the DER system 6 Principles for modelling schedules 6.1 Schedule controllers and their schedules <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 6.2 Schedule structure <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 6.3 Managing schedules 6.3.1 Overview 6.3.2 The state machine of the schedule <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.3.3 The role of the schedule controller <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.4 Configuration of schedules 7 IEC 61850 LN\u2019s and CDC\u2019s 7.1 Controllable entity potentially scheduled 7.2 CommonDataClasses_90_10 7.2.1 Object reference status (ORS) <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.3 Logical node classes 7.3.1 General 7.3.2 LNGroupF 7.3.2.1 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.3.2.2 LN: Schedule Name: FSCH <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.3.2.3 LN: Schedule controller Name: FSCC <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.4 Data object enumerations 7.4.1 General 7.4.2 Scheduling interval types (ScheduleIntervalKind enumeration) <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.4.3 Schedule states (ScheduleStateKind enumeration) 7.5 SCL enumerations (from DOEnums_90_10) <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex A Impact of Mode (Mod) on the schedule status and on the controllable entity <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Annex B Conditions for element presence <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex C Abstract classes used as a basis for new LNs\/CDCs C.1 <> Common attributes for primitive CDC (BasePrimitiveCDC) C.2 <> LN: Domain Name: DomainLN <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex D Scheduling example <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN 61850-90-10. Communication networks and systems for power utility automation. Part 90-10. IEC 61850 objects for scheduling<\/b><\/p>\n |