{"id":261680,"date":"2024-10-19T17:20:28","date_gmt":"2024-10-19T17:20:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-26262-52018-tc\/"},"modified":"2024-10-25T13:07:54","modified_gmt":"2024-10-25T13:07:54","slug":"bs-iso-26262-52018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-26262-52018-tc\/","title":{"rendered":"BS ISO 26262-5:2018 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
133<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | 2 Normative references 3 Terms and definitions 4 Requirements for compliance 4.1 Purpose 4.2 General requirements <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | 4.3 Interpretations of tables 4.4 ASIL-dependent requirements and recommendations 4.5 Adaptation for motorcycles <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | 4.6 Adaptation for trucks, buses, trailers and semi-trailers 5 General topics for the product development at the hardware level 5.1 Objectives 5.2 General <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | 6 Specification of hardware safety requirements 6.1 Objectives <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | 6.2 General 6.3 Inputs to this clause 6.3.1 Prerequisites 6.3.2 Further supporting information 6.4 Requirements and recommendations <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | 6.5 Work products 7 Hardware design 7.1 Objectives <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | 7.2 General 7.3 Inputs to this clause 7.3.1 Prerequisites 7.3.2 Further supporting information 7.4 Requirements and recommendations 7.4.1 Hardware architectural design <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | 7.4.2 Hardware detailed design <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | 7.4.3 Safety analyses <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | 7.4.4 Verification of hardware design 7.4.5 Production, operation, service and decommissioning <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | 7.5 Work products 8 Evaluation of the hardware architectural metrics 8.1 Objectives 8.2 General <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | 8.3 Inputs of this clause 8.3.1 Prerequisites 8.3.2 Further supporting information <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | 8.4 Requirements and recommendations <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | 8.5 Work products <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | 9 Evaluation of safety goal violations due to random hardware failures 9.1 Objectives 9.2 General 9.3 Inputs to this clause 9.3.1 Prerequisites 9.3.2 Further supporting information <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | 9.4 Requirements and recommendations 9.4.1 General <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 9.4.2 Evaluation of Probabilistic Metric for random Hardware Failures (PMHF) <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | 9.4.3 Evaluation of Each Cause of safety goal violation (EEC) <\/td>\n<\/tr>\n | ||||||
170<\/td>\n | 9.4.4 Verification review <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | 9.5 Work products 10 Hardware integration and verification 10.1 Objectives 10.2 General 10.3 Inputs of this clause 10.3.1 Prerequisites 10.3.2 Further supporting information 10.4 Requirements and recommendations <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | 10.5 Work products <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | Annex A (informative) Overview of and workflow of product development at the hardware level <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | Annex B (informative) Failure mode classification of a hardware element <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | Annex C (normative) Hardware architectural metrics <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | Annex D (informative) Evaluation of the diagnostic coverage <\/td>\n<\/tr>\n | ||||||
207<\/td>\n | Annex E (informative) Example calculation of hardware architectural metrics:\u201csingle-point fault metric\u201d and \u201clatent-fault metric\u201d <\/td>\n<\/tr>\n | ||||||
216<\/td>\n | Annex F (informative) Example for rationale that objectives of Clause 9 in accordance with 4.2 are met <\/td>\n<\/tr>\n | ||||||
223<\/td>\n | Annex G (informative) Example of a PMHF budget assignment for an item consisting of two systems <\/td>\n<\/tr>\n | ||||||
227<\/td>\n | Annex H (informative) Example of latent fault handling <\/td>\n<\/tr>\n | ||||||
230<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Road vehicles. Functional safety – Product development at the hardware level<\/b><\/p>\n |