{"id":275624,"date":"2024-10-19T18:32:31","date_gmt":"2024-10-19T18:32:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-16-30334714-dc\/"},"modified":"2024-10-25T14:57:35","modified_gmt":"2024-10-25T14:57:35","slug":"bsi-16-30334714-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-16-30334714-dc\/","title":{"rendered":"BSI 16\/30334714 DC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | Contents Page <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions 4 Principles of detection <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 5 Generation and detection of tracer gas flow 5.1 Tracer gas flows into the object (Group A techniques) 5.2 Tracer gas flows out of the object (Group B techniques) 6 Apparatus \u2014 see EN\u00a013625:2001 <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 7 Object preparation 8 Group A techniques, tracer gas flowing into the object. 8.1 Initial system set up procedure <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 8.2 Vacuum technique (total) test procedure (A.1) <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 8.3 Vacuum technique (partial) test procedure (A.2) <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 8.4 Vacuum technique (local) test procedure (A.3) 9 Group B techniques, tracer gas flowing out of object 9.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 9.2 Initial system set up procedure 9.2.1 Ammonia test with colour-change reagents (B.1) 9.2.2 Tracer gas flowing out of the object (B.2, B.3, B.4, B.6) <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 9.2.3 Pressurisation \u2014 evacuation test (B.5) 9.3 Ammonia test procedure (B.1) 9.3.1 Test object preparation 9.3.2 Reagent application <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 9.3.3 Ammonia pressurization 9.3.4 Impregnation time 9.3.5 Visual examination <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 9.3.6 Post test cleaning 9.4 Vacuum box test procedure (B.2.1, B.2.2) 9.4.1 Technique B.2.1 9.4.2 Technique B.2.2 9.5 Accumulation technique procedure (B.3) <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 9.5.1 Pressure technique by accumulation (B.3.1) <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 9.6 Sniffing test (B.4) <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 9.7 Bombing technique (B.5) <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 9.8 Vacuum chamber technique (B.6) 9.9 Carrier gas technique (B.7) <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 10 Test report <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Annex\u00a0A (informative)Accumulation technique: calibrated leak connected to enclosure of unknown volume <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN ISO 20485. Non-destructive testing. Leak testing. Tracer gas method<\/b><\/p>\n |