{"id":29741,"date":"2024-10-17T03:20:48","date_gmt":"2024-10-17T03:20:48","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-27-09-2009\/"},"modified":"2024-10-24T14:14:17","modified_gmt":"2024-10-24T14:14:17","slug":"asme-b30-27-09-2009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-27-09-2009\/","title":{"rendered":"ASME B30.27 09 2009"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | B30 STANDARD INTRODUCTION <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | SUMMARY OF CHANGES <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Chapter 27-0 Scope, Definitions, and References SECTION 27- 0.1: SCOPE SECTION 27- 0.2: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Figures Fig. 1 Material Placement System: Truck-Mounted Concrete Pump With Integrated Placing Boom Fig. 2 Material Placement System: Separate Placing Boom Fig. 3 Material Placement System: Truck-Mounted Telescopic Conveyor System <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Fig. 4 Material Placement System: Examples of Delivery System Components <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 27- 0.3: REFERENCE TO OTHER CODES AND STANDARDS <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Chapter 27-1 Construction and Installation SECTION 27- 1.1: MARKINGS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | SECTION 27- 1.2: MOBILE MATERIAL PLACING BOOM CONSTRUCTION SECTION 27- 1.3: WORK PLATFORMS, ACCESS WALKWAYS, AND GANGWAYS SECTION 27- 1.4: ELECTRICAL INSTALLATIONS SECTION 27- 1.5: ERGONOMICS SECTION 27- 1.6: OUTRIGGERS <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | SECTION 27- 1.7: CONTROLS AND INDICATORS SECTION 27- 1.8: GUARDS Fig. 5 Standardized Joystick Moveme <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | SECTION 27- 1.9: MOBILE AND STATIONARY PLACING BOOMS SECTION 27- 1.10: DELIVERY SYSTEMS SECTION 27- 1.11: LOSS OF POWER SECTION 27- 1.12: REMOTE STARTING SECTION 27- 1.13: MANUALS SECTION 27- 1.14: FUEL AND EXHAUST SYSTEMS <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | SECTION 27- 1.15: HOPPERS SECTION 27- 1.16: PUMP PRESSURE RELEASE Fig. 6 Grates on Hoppers <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Chapter 27-2 Inspection, Testing, and Maintenance SECTION 27- 2.1: INSPECTION <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | SECTION 27- 2.2: TESTING <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 27- 2.3: MAINTENANCE <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Chapter 27-3 Operation SECTION 27- 3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS AND OPERATING PRACTICES <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | SECTION 27- 3.2: MATERIAL PLACEMENT SYSTEM LOCKOUT\/ TAGOUT <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Fig. 7 Area of Extended Outriggers <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Fig. 8 Danger Zone for Material Placement Systems and Delivery System Operating Near Electrical Transmission Lines Table Table 1 Minimum Required Clearances <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | SECTION 27- 3.3: SIGNALS Fig. 9 Material Placement System Hand Signals <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.27 Material Placement Systems <\/b><\/p>\n |