{"id":29777,"date":"2024-10-17T03:21:27","date_gmt":"2024-10-17T03:21:27","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-23-05-2005\/"},"modified":"2024-10-24T14:14:39","modified_gmt":"2024-10-24T14:14:39","slug":"asme-b30-23-05-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-23-05-2005\/","title":{"rendered":"ASME B30.23 05 2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS Mandatory Appendices <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INTRODUCTION SECTION I: SCOPE SECTION II: SCOPE EXCLUSIONS SECTION III: PURPOSE SECTION IV: USE BY REGULATORY AGENCIES SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | SECTION VI: REQUIREMENTS AND RECOMMENDATIONS SECTION VII: USE OF MEASUREMENT UNITS SECTION VIII: REQUESTS FOR REVISION SECTION IX: REQUESTS FOR INTERPRETATION SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | ASME B30.23-2005 SUMMARY OF CHANGES <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Chapter 23-0 Scope, Definitions, and References SECTION 23-0.1: SCOPE OF B30.23 SECTION 23-0.2: INTENT OF B30.23 SECTION 23-0.3: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | SECTION 23-0.4: REFERENCES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Chapter 23-1 Construction and Characteristics SECTION 23-1.1: DESIGN 23-1.1.1 Personnel Lifting Platform <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 23-1.1.2 Hoisting Equipment <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | SECTION 23-1.2: CONSTRUCTION 23-1.2.1 Personnel Lifting Platform 23-1.2.2 Hoisting Equipment <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Chapter 23-2 Inspection, Testing, and Maintenance SECTION 23-2.1: INSPECTION 23-2.1.1 Personnel Lifting Platform 23-2.1.2 Hoisting Equipment SECTION 23-2.2: TESTING 23-2.2.1 Personnel Lifting Platform <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 23-2.2.2 Hoisting Equipment SECTION 23-2.3 MAINTENANCE 23-2.3.1 Personnel Lifting Platform 23-2.3.2 Hoisting Equipment <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Chapter 23-3 Operation SECTION 23-3.1: PERSONNEL 23-3.1.1 Management 23-3.1.2 Hoisting Equipment Operator <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 23-3.1.3 Ground Crew 23-3.1.4 Personnel Platform Occupants SECTION 23-3.2: PRACTICES 23-3.2.1 Management <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 23-3.2.2 Hoisting Equipment Operator <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 23-3.2.3 Ground Crew 23-3.2.4 Platform Occupants <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 23-3.2.5 Communications <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | I LIFTING PERSONNEL NEAR ELECTRICAL POWER LINES I-1 CONDITION A I-2 CONDITION B <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | I-3 CONDITION C I-4 CONDITION D <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | II PERSONNEL PLATFORM LIFT PLANNING AND AUTHORIZATION FORM <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | III PERSONNEL LIFT PLATFORM PRE-LIFT INSPECTION <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | ASME B30.23 INTERPRETATIONS <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Interpretation: 23-1 Interpretation: 23-2 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.23 Personnel Lifting Systems <\/b><\/p>\n |