{"id":364320,"date":"2024-10-20T01:50:03","date_gmt":"2024-10-20T01:50:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-230882020-2021\/"},"modified":"2024-10-26T02:54:24","modified_gmt":"2024-10-26T02:54:24","slug":"bs-en-iso-230882020-2021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-230882020-2021\/","title":{"rendered":"BS EN ISO 23088:2020 2021"},"content":{"rendered":"
This document specifies the requirements for periodic inspection and testing of welded steel transportable pressure drums of water capacity from 150 l up to 1 000 l and up to 300 bar test pressure intended for compressed and liquefied gases.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Intervals between periodic inspections and tests 5 List of procedures for periodic inspection and test <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 6 Identification of pressure drum 7 Preparation for inspection and testing 7.1 General 7.2 Depressurization 7.3 Devalving and flange removal 8 External visual inspection 8.1 Preparation <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 8.2 Procedure 9 Internal visual inspection 10 Supplementary tests 11 Inspection of openings and fittings 11.1 Internal threads <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 11.2 Damaged internal threads 11.3 Flanged openings and retaining assemblies 11.4 Damaged flanged openings and\/or retaining assemblies <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 12 Pressure test 12.1 General 12.2 Proof pressure test 12.3 Test procedures 12.3.1 Hydraulic test <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 12.3.2 Pneumatic test 12.4 Acceptance criteria <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 13 Repair of pressure drums 13.1 Welds 13.2 Other repairs 13.3 Requirements for repair 14 Inspection of valves 15 Final operations 15.1 Drying and cleaning <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 15.2 Painting 15.3 Fitting valves 15.4 Fitting of flanges 15.5 Verification of tare 15.6 Retest marking <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 15.7 Reference to the next test date 15.8 Records 16 Rejection and rendering unserviceable <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Annex A (informative) Periodic inspection and test periods <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Annex B (normative) Description, evaluation of defects and conditions for rejection of pressure drums at the time of visual inspection <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Gas cylinders. Periodic inspection and testing of welded steel pressure drums. Capacities up to 1 000 l<\/b><\/p>\n |