{"id":422892,"date":"2024-10-20T06:43:27","date_gmt":"2024-10-20T06:43:27","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-clc-ts-51643-322020-2\/"},"modified":"2024-10-26T12:36:45","modified_gmt":"2024-10-26T12:36:45","slug":"bsi-pd-clc-ts-51643-322020-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-clc-ts-51643-322020-2\/","title":{"rendered":"BSI PD CLC\/TS 51643-32:2020"},"content":{"rendered":"

This document describes the principles for selection, installation and coordination of SPDs intended for use in Photovoltaic (PV) systems up to 1500 V DC and for the AC side of the PV system rated up to 1000 V RMS 50\/60 Hz.<\/p>\n

The photovoltaic installation extends from a PV array or a set of interconnected PV-modules to include the associated cabling and protective devices and the converter up to the connection point in the distribution board or the utility supply point.<\/p>\n

This document considers SPDs used in different locations and in different kinds of PV systems:<\/p>\n