{"id":78941,"date":"2024-10-17T18:27:21","date_gmt":"2024-10-17T18:27:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784409879-2008\/"},"modified":"2024-10-24T19:38:36","modified_gmt":"2024-10-24T19:38:36","slug":"asce-9780784409879-2008","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784409879-2008\/","title":{"rendered":"ASCE 9780784409879 2008"},"content":{"rendered":"
This report explains in detail the key steps in writing a request for proposal (RFP) or specifications document for construction projects using design-build as the project delivery method.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1.0 Introduction 1.1 General Purpose and Goals <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2.0 Design-Build Contract Complexities 2.1 Introduction 2.2 Owner\u2019s Objectives and Critical Capabilities 2.3 Design-Build Project Organization Approaches <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.4 Project Sequence and Scheduling Options <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 2.5 Project Ownership and Operation 2.6 Design-Build Compensation Options <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 2.7 Constructor Design Input 2.8 Project Types Less Suitable for Design-Build <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.0 Project Definition and Conceptual Design 3.1 Introduction 3.2 Acquiring a Conceptual Design <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 3.3 Articulating Owner\u2019s Values and Expectations <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 3.4 Scope of Work <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.0 Preparing the Request for Proposals 4.1 Introduction 4.2 Selection Criteria <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.3 Qualifications <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.4 Technical Considerations <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 4.5 Cost Considerations <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.0 General Terms and Conditions 5.1 Introduction 5.2 Project Schedule Objectives 5.3 Pursuit of Optimal Project Schedule 5.4 Unusual Scope Inclusions <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.5 Change Management Program 5.6 Design Documentation 5.7 Pursuit of Enhanced Project Constructability 5.8 Application of Value Engineering Studies <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.9 Pursuit of Life-Cycle Cost Economy 5.10 Value Engineering Change Proposals 5.11 Examples of Contract Provisions <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.0 Specifications for Design-Build Projects 6.1 Introduction 6.2 Owner-Generated Specifications <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.3 Contractor-Generated Specifications <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Appendix 1 Sample Request for Proposal Technical Criteria <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Appendix 2 Sample Design-Build Performance Specification <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Index C D E G J O P Q R <\/td>\n<\/tr>\n | ||||||