{"id":79724,"date":"2024-10-17T18:37:18","date_gmt":"2024-10-17T18:37:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1095-1990\/"},"modified":"2024-10-24T19:41:07","modified_gmt":"2024-10-24T19:41:07","slug":"ieee-1095-1990","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1095-1990\/","title":{"rendered":"IEEE 1095 1990"},"content":{"rendered":"
New IEEE Standard – Inactive – Superseded. This standard describes installation procedures for synchronous generators and generator\/motors rated 5000 kVA and above, to be coupled to hydraulic turbines having vertical shafts.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Introduction and Scope 2. References <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3. Tools and Facilities 3.1 General 3.2 Erection Contractor-Supplied Tools 3.3 Manufacturer-Supplied Tools <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3.4 Customer-Supplied Materials, Services, and Facilities 4. Personnel 5. Generator Construction 5.1 General Arrangement <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5.2 Stator Construction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.3 Rotor Construction <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.4 Shaft and Coupling 5.5 Thrust Bearing <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.6 Guide Bearings <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.7 Brakes and Jacks 5.8 Field Assembly Requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6. Preparation of Generator and Turbine Shafts in Factory 6.1 Factory Preassembly and Alignment 6.2 Field Alignment 7. Installation Precautions 7.1 Position References <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.2 Handling of Generator Parts 7.3 Matching of Parts 7.4 Use of Plumb Lines 7.5 Precautions in Welding <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7.6 Cleanliness 7.7 Keeping Records 8. Receiving, Storing, and Unpacking 8.1 Receiving <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8.2 Storing <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.3 Unpacking 9. Erection Procedures 9.1 General <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 9.2 Generator Shipped Completely Assembled 9.3 Generator Assembled in the Field, Thrust Bearing Above the Rotor, Spring-Type or Self-Equalizing-type Thrust Bearing <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9.4 Generator Assembled in the Field, Thrust Bearing Above the Rotor, Adjustable-Shoe-Type Thrust Bearing <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 9.5 Generator Assembled in the Field, Thrust Bearing Below the Rotor, Spring-Type or Self-Equalizing-Type Thrust Bearing <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9.6 Generator Assembled in the Field, Thrust Bearing Below the Rotor, Adjustable-Shoe-Type Thrust Bearing <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 10. Details of Erection Procedures 10.1 Placing a Foundation Bolts 10.2 Positioning and Grouting of Soleplates <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 10.3 Assembly of Stator <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 10.4 Assembly of Rotor <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 10.5 Assembly of Thrust Bearings 10.6 Assembly of Guide Bearings <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 10.7 Installation of Lubrication System 10.8 Checking Air Gap 10.9 Check of Insulation Against Shaft Currents 10.10 Closing of Generator-Turbine Coupling <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 10.11 Shaft-Plumb and Straightness Check 10.12 Equalizing the Load on Adjustable-Shoe-Type Bearings 10.13 Check of Shaft Runout 10.14 Assembly of Rotating Exciters (If Provided), Collector Rings, and Brush Rigging <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 10.15 Installation of Instruments and Relays 11. Mechanical Run 11.1 General <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 11.2 Preparation for Initial Start 11.3 Initial Start <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 11.4 Check of Shaft Runout 12. Balancing <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 13. Insulation Testing and Drying Out 13.1 Measurement of Winding Insulation Resistance 13.2 Drying Out of Windings <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 13.3 High-Potential Tests 14. Initial Operation 14.1 No-Load Operation and Excitation 14.2 Connection to Power System 14.3 Load Rejection Tests <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 14.4 Operation Check of Shaft Runout 15. Field Tests 15.1 Vertical Hydraulic-Turbine Generator Shaft Runout Tolerances, Installation Check <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 15.2 Electrical Tests <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Installation of Vertical Generators and Generator\/Motors for Hydroelectric Applications<\/b><\/p>\n |